← All nodes
Automation

Schedule Trigger

Shows, as one row, what started this run and the schedule that starts the flow: a master schedule that runs it comes first, otherwise the flow's own Schedule settings.

When to use it

Use it at the start of a scheduled flow to stamp each run with when and why it ran, or to check which schedule is in charge of the flow.

In a pipeline

Example

A nightly run

One row
Triggered ByScheduled ForRun StartedScheduleFrequencyNext Run
Flow schedule2026-10-17T18:00:00.000Z2026-10-17T18:00:02.000ZFlow scheduleEvery day at 02:00 (Asia/Shanghai)2026-10-18T18:00:00.000Z

Worth knowing

  • The node has no settings of its own: set the schedule in the flow's Schedule settings or in the Scheduler, and the node shows it.
  • When a master schedule runs the flow, that schedule is shown, even if the flow also has its own.
  • Join it to your data to stamp every row with the run time.

Others in Automation